Kitchen Remodel Timeline: How Long Will Your Project Take?

Kitchen remodel timeline for Southwest Florida homes: the six phases from design to punch list, lead times, permits and tips for living without a kitchen.

October 16, 20268 min readBy Cristiano Barbosa
Southwest Florida kitchen remodel in progress with new cabinets installed and countertops waiting for templating

A kitchen remodel timeline runs on two clocks: the weeks spent planning and ordering, and the weeks a crew spends in your home. Most homeowners only plan for the second one, then get surprised when cabinets take a month to arrive. In Southwest Florida the order of events is the same as anywhere else, and knowing it in advance is the easiest way to keep a project calm. This guide walks through each phase, explains what drives the schedule and shares practical ways to cook without a kitchen. It is a companion to our full guide to kitchen remodeling in Southwest Florida.

Kitchen Remodel Timeline at a Glance: The Six Phases

A kitchen remodel timeline has six phases that almost always run in the same order. Cabinet maker KraftMaid groups the work into four stages (plan, order, demolition and rough-in, then installation) on its project timeline page and says a project can last a few weeks or a few months, depending on size, material availability and how quickly you decide. Permits and the punch list are added here as their own steps. Here are the kitchen remodel phases in order:

  • Design, measuring and selections
  • Ordering cabinets, counters, fixtures and appliances
  • Permit and demolition
  • Plumbing, electrical and drywall rough-in
  • Installation of floors, cabinets, counters, backsplash and fixtures
  • Punch list and final walkthrough

Much of the calendar time piles up in the first two phases, before any crew arrives at your door. The rest of this guide takes each phase in turn.

Design and Selections Come First

Every kitchen remodel timeline starts with design, and design only ends when every major item is chosen. That means layout, cabinet style and finish, countertop material, flooring, backsplash tile, lighting, sink and faucet, and the appliance package. Appliances matter more than most people expect, because cabinet openings are built around their exact dimensions. KraftMaid advises revising your plan on paper as many times as it takes, because changing course after you order materials and begin construction is harder and far more expensive. Phenomenal Renovation's kitchen remodeling service covers cabinet installation and refacing, countertops and islands, tile backsplashes, flooring, fixtures and lighting, so these choices can be made in one conversation.

Kitchen Remodel Lead Times: Why Ordering Sets the Schedule

Kitchen remodel lead times, not demolition, usually decide how long the whole job takes. KraftMaid states that its cabinets take a minimum of 4 weeks to arrive. Whatever you order, ask your supplier for the exact delivery date. Countertops add a second wait, because installers measure for them only after the cabinets are set. Order cabinets as soon as the design is signed off, and ask for every delivery date in writing. When the boxes arrive, inspect them for shipping damage before the crew starts, so problems are caught before installation begins. Ask your contractor for the expected arrival of each major item, then plan the start date around the longest wait.

Do You Need a Permit? How Permits Fit the Schedule

Permits are a scheduling step in any kitchen remodel timeline, not an afterthought. Under Section 105.1 of the 2023 Florida Building Code, Building, an owner who intends to alter a building, or to install, alter, repair or replace an electrical, gas, mechanical or plumbing system, must first apply to the building official and obtain the permit. Section 105.2.2 allows ordinary minor repairs with the building official's approval, but not work that cuts away part of a wall or replaces or relocates piping or wiring. Review times differ by city and county, so ask how long your jurisdiction is taking today. Our kitchen remodeling guide notes that we manage permit applications and municipal inspections directly.

Demolition, Rough-In and Installation: What Happens on Site

Once materials are ordered and permits are in hand, this part of the kitchen remodel timeline moves fast. KraftMaid puts demolition, plumbing, electrical and HVAC rough-in, and drywall and paint at a few days to 2 weeks. It then lists 4 to 6 weeks for installation: flooring, cabinets, countertop measuring and install, lighting, faucets, backsplash, hardware and finish carpentry. Expect surprises during demolition, such as hidden water damage or outdated wiring, because they are part of almost every remodel, so leave a little room in the plan. Phenomenal Renovation handles plumbing in-house through its licensed plumber, so that trade does not wait on an outside subcontractor.

Southwest Florida kitchen during demolition and rough-in with old cabinets removed and walls open

The Punch List and Final Walkthrough

The punch list is the last phase of every kitchen remodel timeline. It is a written list of small fixes, such as a scuffed door, a loose hinge, a paint touch-up or a caulk line that needs redoing. KraftMaid recommends noting each scuff or touch-up as you see it, so your contractor can address them together. Walk the kitchen with your contractor in good light, open every drawer and door, run the faucet and test every outlet and appliance. Agree on the list in writing and confirm when each item will be fixed. Phenomenal Renovation backs its work with a one-year workmanship warranty, so ask how the process works if something shows up later.

Living Without a Kitchen During a Remodel

Living without a kitchen is the part of a remodel that homeowners underestimate. Set up a temporary kitchen before demolition day, in a spare room, garage or dining area. A microwave, a small refrigerator or cooler, a slow cooker, a toaster oven and an electric kettle cover most meals. KraftMaid suggests thinking ahead about slow cooker meals, where the kids will eat and how pets will stay safe. Box up dishes and pantry items early, and stock paper plates and a basin for rinsing. Ask your contractor to protect the floors and walls leading to and from the work area, since demolition is dusty.

Temporary kitchen in a Florida dining room with microwave, slow cooker and small refrigerator during a remodel

How to Keep Your Kitchen Remodel Schedule on Track

A kitchen remodel schedule stays on track when decisions are made before work begins and the plan is written down. Finalize every selection before ordering, including appliances, and avoid changes once orders are placed. Ask for a written phase schedule with expected delivery dates for cabinets and counters. Agree on how change requests are priced and how they move the dates. Keep a buffer, because KraftMaid notes that surprises and delays are part of every remodeling project. Phenomenal Renovation provides a dedicated project lead and a detailed estimate within one to two days, so you know who to call when a date moves.

FAQ: Kitchen Remodel Timeline Questions

How long does a kitchen remodel take?

It depends on scope. KraftMaid says a project can run from a few weeks to a few months, and lists 4 to 6 weeks for the installation phase once cabinets arrive. Planning and ordering come before that. Ask your contractor for a written schedule based on your layout, cabinet choice and local permit review times.

What takes the longest in a kitchen remodel?

Waiting for materials is usually the longest stretch, especially cabinets, which KraftMaid says take a minimum of 4 weeks to arrive. Countertops follow, because they are measured after the cabinets are installed. Permit review can also add time. On site, installation is the longest work phase.

Can I stay in my home during a kitchen remodel?

Most homeowners do. The kitchen will be unusable for part of the project, so set up a temporary kitchen first, protect the paths to the work area and plan simple meals. Ask your contractor which days will be the noisiest and dustiest so you can plan around them.

Do I need a permit for a kitchen remodel in Florida?

Often yes. The Florida Building Code requires a permit before you alter a building or install, alter, repair or replace electrical, gas, mechanical or plumbing systems. Minor repairs may be approved without one. Check with your local building department, or ask a licensed contractor, before work starts.

Ready to Plan Your Kitchen Remodel Timeline?

Ready to plan your kitchen remodel timeline? Phenomenal Renovation is a licensed and insured Florida remodeler serving Fort Myers, Cape Coral, Naples, Bonita Springs, Estero and LaBelle. Call (239) 878-3404 or request a free estimate through our kitchen remodeling page to talk through your design, ordering and schedule. You can also see our Fort Myers service area for local details.

C
About Cristiano Barbosa

Cristiano Barbosa is the Founder & CEO of Phenomenal Renovation, a family-owned remodeling company serving Fort Myers, Cape Coral, Naples, Bonita Springs, Estero, and LaBelle. With over 20 years of hands-on experience and two generations of construction knowledge behind him, he holds both a Certified Residential Contractor (CRC) license and a Licensed Plumber license, letting his crew handle plumbing and waterproofing in-house instead of outsourcing it, and has led his team through more than 350 successful renovations across Southwest Florida.

Free estimate · response within 1–2 days

Pick a date

1
2
3
4
October 2026
SUMOTUWETHFRSA

Available times

Select a date to see available times

Need help? Call us now
Bathroom before and after a Phenomenal Renovation remodel
BeforeAfter

1-Year Workmanship Warranty

Every installation is backed by our 1-year warranty. If something isn't right, we come back and make it right.

© Copyright 2026 - All Rights Reserved.